| Certainteed Corporation – Milan, Ohio |
 |
New roofing shingle
production line |
 |
Silos to process line wiring
and control |
 |
Bulk material handling system |
 |
Communication systems for PLCs |
 |
| Daimler Chrysler – Toledo, Ohio |
 |
Install, level, wire and test new assembly
robots |
 |
| Johns Manville, Insulation
Group – Waterville and Defiance, Ohio |
 |
Unit 81 fine mesh collection screen upgrade
at Defiance, Ohio Plant-08 |
 |
Instrumentation wiring, pneumatic piping,
and controls installation, pipe insulation project |
 |
Custom production equipment, install, structural,
platform, and stack erection; pipe insulation project |
 |
Prefabricated, fully wired control skids |
 |
| GM – Lordstown |
 |
Installed over 2000 ft. power and free
conveyor system |
 |
Electrical installation on the power and
free conveyor |
 |
Screen guard installation |
 |
Stampings plant electrical installation |
 |
| GM Powertrain, Toledo,
Ohio |
| Installation of ML4 and ML5
Assembly Lines |
 |
Six-speed transmission project equipment
moves and wiring |
 |
Floor conveyor |
 |
Double stacked roller conveyors |
 |
Washers, washer filters |
 |
Test stands |
 |
Overhead ergomatic hoist systems |
 |
Structural headers |
 |
Leg supports |
 |
Turntables, platforms and crossover stairs |
 |
| Monorail System |
 |
Installation of 2000 ft. monorail |
 |
Drivers, oilers, chains, carriers,
screen guard |
 |
Anti-backups, anti-runways |
 |
Header steel |
 |
Bracing and legs |